PERMIT FOR F-1, FOOD PROCESSING FACILITY, WITH S-1, A-2 & B ACCESSORY USES. CONVENTIONAL FOUNDATION WITH SLAB-ON GRADE ON AGGREGATE PIERS. FULL SPRINKLER SYSTEM WITH FIRE DEPARTMENT ACCESS ROOM, ALARM SYSTEM AS APPROVED BY DFD. INSULATED CONCRETE WALL PANELS WITH STRUCTURAL STEEL COLUMNS, BEAMS & JOISTS. EMERGENCY INTERIOR AND EXTERIOR BACK UP LIGHTING THROUGHOUT PROVIDING EGRESS PATH ILLUMINATION. ADA COMPLIANT THROUGHOUT BUILDING AND PARKING LOT. ALL WORK SUBJECT TO ONSITE INSPECTION & APPROVAL. OTHER TRADES REQUIRE SEPARATE PERMITS. SMOKE AND CARBON MONOXIDE DETECTORS REQUIRED PER CODE. ALL PER CITY CODE.
Inspection details
Plumbing Sewer and Water Inspection
Inspection Performed By: WILLIAM LITTLE
Inspection Date: 2024-06-04
Completion Date: 2024-06-04
Notes: Water service
Inspection Status: Pass
Plumbing Sewer and Water Inspection
Inspection Performed By: JOHN CLAEYS
Inspection Date: 2024-07-15
Completion Date: 2024-07-15
Notes: WATER MAIN - WEST SIDE. PHOTOS VIEWED SHOWED PIPE AND VALVE PROPERLY BEDDED WITH GRANULAR MATERIAL. TERRACON IS DOING COMPACTION TESTS.
Inspection Status: Pass
Plumbing Interior Underground Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2024-07-30
Completion Date: 2024-07-30
Notes: trucker lounge
Inspection Status: Pass
Plumbing Interior Underground Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2024-07-30
Completion Date: 2024-07-30
Notes: san. sewer trunk 8.9 column line, test ok
Inspection Status: Pass
Plumbing Interior Underground Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2024-08-01
Completion Date: 2024-08-01
Notes: Greasy waste trunk line 12 trunk line cover and stack test ok.
Inspection Status: Pass
Plumbing Sewer and Water Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2024-08-02
Completion Date: 2024-08-02
Notes: process water trunk line and stack test ok
Inspection Status: Pass
Building Footing
Inspection Performed By: JOHN CLAEYS
Inspection Date: 2024-08-06
Completion Date: 2024-08-06
Notes: FIRE PUMP AND WASTE WATER BUILDINGS.
Inspection Status: Pass
Plumbing Sewer and Water Inspection
Inspection Performed By: WILLIAM LITTLE
Inspection Date: 2024-08-26
Completion Date: 2024-08-26
Inspection Status: Pass
Plumbing Interior Underground Inspection
Inspection Performed By: WILLIAM LITTLE
Inspection Date: 2024-08-27
Completion Date: 2024-08-27
Notes: PVC only section18
Inspection Status: Pass
Plumbing Interior Underground Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2024-09-11
Completion Date: 2024-09-11
Notes: Grease tunnel area 7.
Inspection Status: Pass
Plumbing Interior Underground Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2024-09-16
Completion Date: 2024-09-16
Notes: grease waste col. 17 east ok
Inspection Status: Pass
Electrical Cover
Inspection Performed By: MICHAEL ANDERSON
Inspection Date: 2024-09-26
Completion Date: 2024-09-26
Notes: Underground for service equipment.
Inspection Status: Pass
Electrical Cover
Inspection Performed By: MICHAEL ANDERSON
Inspection Date: 2024-09-26
Completion Date: 2024-09-26
Notes: Underground for service equipment.
Inspection Status: Pass
Plumbing Interior Underground Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2024-09-30
Completion Date: 2024-09-30
Notes: office area east
Inspection Status: Pass
Plumbing Interior Underground Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2024-10-01
Completion Date: 2024-10-01
Notes: branch piping west of col. 17 grease waste main area 3.
Inspection Status: Pass
Electrical Cover
Inspection Performed By: MICHAEL ANDERSON
Inspection Date: 2024-10-02
Completion Date: 2024-10-02
Notes: 2nd excavation in electrical room #141.
Inspection Status: Pass
Plumbing Interior Underground Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2024-10-04
Completion Date: 2024-10-04
Notes: Col. 12 GW main branches west
Inspection Status: Pass
Electrical Cover
Inspection Performed By: MICHAEL ANDERSON
Inspection Date: 2024-10-07
Completion Date: 2024-10-07
Notes: 3rd excavation in electrical room #141.
Inspection Status: Pass
Plumbing Interior Underground Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2024-10-10
Completion Date: 2024-10-10
Notes: Area six boiler room corridor and grease waste room.
Inspection Status: Pass
Electrical Cover
Inspection Performed By: MICHAEL ANDERSON
Inspection Date: 2024-10-11
Completion Date: 2024-10-11
Notes: Compressor room underground.
Inspection Status: Pass
Plumbing Sewer and Water Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2024-10-23
Completion Date: 2024-10-23
Notes: grease interceptor and vents
Inspection Status: Pass
Plumbing Interior Underground Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2024-10-23
Completion Date: 2024-10-23
Notes: west dock process waste and east branch compressor room.
Inspection Status: Pass
Plumbing Sewer and Water Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2024-10-29
Completion Date: 2024-10-29
Notes: partial 2" copper service to guard shack.
Inspection Status: Pass
Plumbing Sewer and Water Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2024-10-30
Completion Date: 2024-10-30
Notes: west side grease tunnel first 20" outside of building.
Inspection Status: Pass
Plumbing Interior Underground Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2024-11-01
Completion Date: 2024-11-01
Notes: area 1 to office
Inspection Status: Pass
Plumbing Interior Underground Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2024-11-07
Completion Date: 2024-11-07
Notes: area 1 office
Inspection Status: Pass
Electrical Cover
Inspection Performed By: MICHAEL ANDERSON
Inspection Date: 2024-11-08
Completion Date: 2024-11-08
Notes: Underground for medium voltage transformer pads.
Inspection Status: Pass
Building Footing
Inspection Performed By: MAX ADAMS
Inspection Date: 2022-11-28
Completion Date: 2022-11-28
Inspection Status: Pass
Building Footing
Inspection Performed By: MAX ADAMS
Inspection Date: 2022-11-29
Completion Date: 2022-11-29
Inspection Status: Pass
Building Footing
Inspection Performed By: MAX ADAMS
Inspection Date: 2022-12-02
Completion Date: 2022-12-02
Inspection Status: Pass
Building Footing
Inspection Performed By: MAX ADAMS
Inspection Date: 2022-12-16
Completion Date: 2022-12-16
Inspection Status: Pass
Building Footing
Inspection Performed By: MAX ADAMS
Inspection Date: 2023-01-04
Completion Date: 2023-01-04
Inspection Status: Pass
Building Footing
Inspection Performed By: MAX ADAMS
Inspection Date: 2023-01-10
Completion Date: 2023-01-10
Inspection Status: Pass
Building Footing
Inspection Performed By: JOHN CLAEYS
Inspection Date: 2024-02-12
Completion Date: 2024-02-12
Notes: NORTHEAST 1/3.
Inspection Status: Pass
Building Footing
Inspection Performed By: JOHN CLAEYS
Inspection Date: 2024-02-14
Completion Date: 2024-02-14
Notes: CENTER 1/3RD OF NORTH WALL.
Inspection Status: Pass
Building Footing
Inspection Performed By: JOHN CLAEYS
Inspection Date: 2024-02-16
Completion Date: 2024-02-16
Notes: 200 FT WEST OF PREVIOUS NORTH WALL APPROVAL.
Inspection Status: Pass
Building Pier Footings
Inspection Performed By: JOHN CLAEYS
Inspection Date: 2024-02-21
Completion Date: 2024-02-21
Notes: 2 - INTERIOR PIER PADS IN SOUTHEAST AREA OF BUILDING.
Inspection Status: Pass
Building Footing
Inspection Performed By: JOHN CLAEYS
Inspection Date: 2024-02-29
Completion Date: 2024-02-29
Notes: MORE NORTH EXTERIOR WALL FOOTINGS. ALSO INTERIOR FOOTINGS ON NORTHEAST AREA.
Inspection Status: Pass
Building Footing
Inspection Performed By: JOHN CLAEYS
Inspection Date: 2024-03-05
Completion Date: 2024-03-05
Notes: PART OF SOUTH WALL.
Inspection Status: Pass
Building Footing
Inspection Performed By: JOHN CLAEYS
Inspection Date: 2024-03-06
Completion Date: 2024-03-06
Notes: MORE NORTH WALL FOOTINGS / 3 PIERS.
Inspection Status: Pass
Building Footing
Inspection Performed By: JOHN CLAEYS
Inspection Date: 2024-03-07
Completion Date: 2024-03-07
Notes: NORTH WALL FOOTINGS. PIERS 7 AND 6 AND BULKHEADED APPROXIMATELY 8' PAST PIER 6 TOWARDS PIER 5.
Inspection Status: Pass
Building Footing
Inspection Performed By: JACOB RALFS
Inspection Date: 2024-03-15
Completion Date: 2024-03-15
Notes: NW CORNER BOTH WAYS
Inspection Status: Pass
Building Footing
Inspection Performed By: JOHN CLAEYS
Inspection Date: 2024-03-20
Completion Date: 2024-03-20
Notes: PART SOUTH WALL.
Inspection Status: Pass
Building Footing
Inspection Performed By: JOHN CLAEYS
Inspection Date: 2024-03-28
Completion Date: 2024-03-28
Notes: Southwest corner and part south wall.
Inspection Status: Pass
Building Footing
Inspection Performed By: JOHN CLAEYS
Inspection Date: 2024-04-09
Completion Date: 2024-04-09
Notes: BALANCE OF SOUTH EXTERIOR WALL FOOTINGS.
Inspection Status: Pass
Building Footing
Inspection Performed By: JOHN CLAEYS
Inspection Date: 2024-05-07
Completion Date:
Notes: STOOP FOOTING ON NORTHEAST CORNER OF THE BUILDING. OK AS VERBALLY DESCRIBED.