Building Permit / Inspection Search

Viewing Permit & Inspection Details for: 22-58211

Permit details

Address
2951 ENTERPRISE WAY
Date Issued
2024-01-22
Expires
2026-09-18
Permit Number
22-58211
Permit Type
BUILDING PERMIT
Construction Type
IIB
Class of Work
NEW
Owner
FAIR OAKS FARMS LLC
7600 95TH ST
PLEASANT PR WI 531582713
Building Type
COMMERCIAL
Parcel Number
W3307A01
Job Cost
$43000000
Permit Fees
$161543.75
Square Feet
134069
Sprinkler
Yes
Occupancy Load
None Entered
Contractor
THE AUSTIN COMPANY
Notes
PERMIT FOR F-1, FOOD PROCESSING FACILITY, WITH S-1, A-2 & B ACCESSORY USES. CONVENTIONAL FOUNDATION WITH SLAB-ON GRADE ON AGGREGATE PIERS. FULL SPRINKLER SYSTEM WITH FIRE DEPARTMENT ACCESS ROOM, ALARM SYSTEM AS APPROVED BY DFD. INSULATED CONCRETE WALL PANELS WITH STRUCTURAL STEEL COLUMNS, BEAMS & JOISTS. EMERGENCY INTERIOR AND EXTERIOR BACK UP LIGHTING THROUGHOUT PROVIDING EGRESS PATH ILLUMINATION. ADA COMPLIANT THROUGHOUT BUILDING AND PARKING LOT. ALL WORK SUBJECT TO ONSITE INSPECTION & APPROVAL. OTHER TRADES REQUIRE SEPARATE PERMITS. SMOKE AND CARBON MONOXIDE DETECTORS REQUIRED PER CODE. ALL PER CITY CODE.
Inspection details

Plumbing Sewer and Water Inspection
Inspection Performed By: WILLIAM LITTLE
Inspection Date: 2024-06-04
Completion Date: 2024-06-04
Notes: Water service
Inspection Status: Pass
Plumbing Sewer and Water Inspection
Inspection Performed By: JOHN CLAEYS
Inspection Date: 2024-07-15
Completion Date: 2024-07-15
Notes: WATER MAIN - WEST SIDE. PHOTOS VIEWED SHOWED PIPE AND VALVE PROPERLY BEDDED WITH GRANULAR MATERIAL. TERRACON IS DOING COMPACTION TESTS.
Inspection Status: Pass
Plumbing Interior Underground Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2024-07-30
Completion Date: 2024-07-30
Notes: trucker lounge
Inspection Status: Pass
Plumbing Interior Underground Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2024-07-30
Completion Date: 2024-07-30
Notes: san. sewer trunk 8.9 column line, test ok
Inspection Status: Pass
Plumbing Interior Underground Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2024-08-01
Completion Date: 2024-08-01
Notes: Greasy waste trunk line 12 trunk line cover and stack test ok.
Inspection Status: Pass
Plumbing Sewer and Water Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2024-08-02
Completion Date: 2024-08-02
Notes: process water trunk line and stack test ok
Inspection Status: Pass
Building Footing
Inspection Performed By: JOHN CLAEYS
Inspection Date: 2024-08-06
Completion Date: 2024-08-06
Notes: FIRE PUMP AND WASTE WATER BUILDINGS.
Inspection Status: Pass
Plumbing Sewer and Water Inspection
Inspection Performed By: WILLIAM LITTLE
Inspection Date: 2024-08-26
Completion Date: 2024-08-26
Inspection Status: Pass
Plumbing Interior Underground Inspection
Inspection Performed By: WILLIAM LITTLE
Inspection Date: 2024-08-27
Completion Date: 2024-08-27
Notes: PVC only section18
Inspection Status: Pass
Plumbing Interior Underground Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2024-09-11
Completion Date: 2024-09-11
Notes: Grease tunnel area 7.
Inspection Status: Pass
Plumbing Interior Underground Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2024-09-16
Completion Date: 2024-09-16
Notes: grease waste col. 17 east ok
Inspection Status: Pass
Electrical Cover
Inspection Performed By: MICHAEL ANDERSON
Inspection Date: 2024-09-26
Completion Date: 2024-09-26
Notes: Underground for service equipment.
Inspection Status: Pass
Electrical Cover
Inspection Performed By: MICHAEL ANDERSON
Inspection Date: 2024-09-26
Completion Date: 2024-09-26
Notes: Underground for service equipment.
Inspection Status: Pass
Plumbing Interior Underground Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2024-09-30
Completion Date: 2024-09-30
Notes: office area east
Inspection Status: Pass
Plumbing Interior Underground Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2024-10-01
Completion Date: 2024-10-01
Notes: branch piping west of col. 17 grease waste main area 3.
Inspection Status: Pass
Electrical Cover
Inspection Performed By: MICHAEL ANDERSON
Inspection Date: 2024-10-02
Completion Date: 2024-10-02
Notes: 2nd excavation in electrical room #141.
Inspection Status: Pass
Plumbing Interior Underground Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2024-10-04
Completion Date: 2024-10-04
Notes: Col. 12 GW main branches west
Inspection Status: Pass
Electrical Cover
Inspection Performed By: MICHAEL ANDERSON
Inspection Date: 2024-10-07
Completion Date: 2024-10-07
Notes: 3rd excavation in electrical room #141.
Inspection Status: Pass
Plumbing Interior Underground Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2024-10-10
Completion Date: 2024-10-10
Notes: Area six boiler room corridor and grease waste room.
Inspection Status: Pass
Electrical Cover
Inspection Performed By: MICHAEL ANDERSON
Inspection Date: 2024-10-11
Completion Date: 2024-10-11
Notes: Compressor room underground.
Inspection Status: Pass
Plumbing Sewer and Water Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2024-10-23
Completion Date: 2024-10-23
Notes: grease interceptor and vents
Inspection Status: Pass
Plumbing Interior Underground Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2024-10-23
Completion Date: 2024-10-23
Notes: west dock process waste and east branch compressor room.
Inspection Status: Pass
Plumbing Sewer and Water Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2024-10-29
Completion Date: 2024-10-29
Notes: partial 2" copper service to guard shack.
Inspection Status: Pass
Plumbing Sewer and Water Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2024-10-30
Completion Date: 2024-10-30
Notes: west side grease tunnel first 20" outside of building.
Inspection Status: Pass
Plumbing Interior Underground Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2024-11-01
Completion Date: 2024-11-01
Notes: area 1 to office
Inspection Status: Pass
Plumbing Interior Underground Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2024-11-07
Completion Date: 2024-11-07
Notes: area 1 office
Inspection Status: Pass
Electrical Cover
Inspection Performed By: MICHAEL ANDERSON
Inspection Date: 2024-11-08
Completion Date: 2024-11-08
Notes: Underground for medium voltage transformer pads.
Inspection Status: Pass
Gas Pipe Affidavit
Inspection Performed By: JONATHON KEENEY
Inspection Date: 2024-12-02
Completion Date: 2024-12-02
Inspection Status: Pass
Gas Meter Release
Inspection Performed By: JONATHON KEENEY
Inspection Date: 2024-12-02
Completion Date: 2024-12-02
Notes: construction heat. The gas main is temporary as the gas meter is being manufactured & is several months out. Once the gas meter is set all new larger gas mains will be ran.
Inspection Status: Pass
Plumbing Interior Underground Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2025-01-10
Completion Date: 2025-01-10
Notes: area drains north west corner near office.
Inspection Status: Pass
Plumbing Cover
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2025-01-21
Completion Date: 2025-01-21
Notes: area #5 office
Inspection Status: Pass
Plumbing Cover
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2025-01-24
Completion Date: 2025-01-24
Notes: truckers lounge wall cover.
Inspection Status: Pass
Plumbing Interior Underground Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2025-02-06
Completion Date: 2025-02-06
Notes: section 2 boiler room ok
Inspection Status: Pass
Electrical Cover
Inspection Performed By: MICHAEL ANDERSON
Inspection Date: 2025-02-20
Completion Date: 2025-02-20
Notes: Underground - area 1 & 2 offices.
Inspection Status: Pass
Plumbing Interior Underground Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2025-02-27
Completion Date: 2025-02-27
Notes: area 1 locker
Inspection Status: Pass
Plumbing Cover
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2025-02-27
Completion Date: 2025-02-27
Notes: area 1 office
Inspection Status: Pass
Plumbing Ground Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2025-03-20
Completion Date: 2025-03-20
Notes: grease interceptor
Inspection Status: Pass
Plumbing Cover
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2025-03-26
Completion Date: 2025-03-26
Notes: Area 1 break room restrooms
Inspection Status: Pass
Plumbing Sewer and Water Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2025-04-09
Completion Date: 2025-04-09
Notes: fire and domestic risers/riser room
Inspection Status: Pass
Electrical Cover
Inspection Performed By: MICHAEL ANDERSON
Inspection Date: 2025-04-08
Completion Date: 2025-04-08
Notes: Walls - area 1 main offices & area 5.
Inspection Status: Pass
Mechanical Cover
Inspection Performed By: JONATHON KEENEY
Inspection Date: 2025-05-09
Completion Date: 2025-05-09
Notes: Hard lid for East & West break rooms, locker rooms & rest rooms Hard lid in Room 106B & restroom Questioning 2 fire walls w/o dampers. @ exhaust hoods w/o MUA as well.
Inspection Status: Pass
Building Framing Before Cover
Inspection Performed By: NICHOLAS SIM
Inspection Date: 2025-05-12
Completion Date: 2025-05-12
Notes: Area 5 only- fire caulk 3 penetrations and stencil walls above ceilings.
Inspection Status: Fail
Building Framing Before Cover
Inspection Performed By: NICHOLAS SIM
Inspection Date: 2025-05-14
Completion Date: 2025-05-14
Notes: Corrections made for area 5.
Inspection Status: Pass
Building Framing Before Cover
Inspection Performed By: NICHOLAS SIM
Inspection Date: 2025-05-22
Completion Date: 2025-05-22
Notes: Area "1" walls.
Inspection Status: Pass
Electrical Cover
Inspection Performed By: MICHAEL ANDERSON
Inspection Date: 2025-05-27
Completion Date: 2025-05-27
Notes: Underground for south and west parking lot lights.
Inspection Status: Pass
Plumbing Ground Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2025-06-03
Completion Date: 2025-06-03
Notes: vault for sanitary sewer flow meter and pipe work.
Inspection Status: Pass
Electrical Cover
Inspection Performed By: MICHAEL ANDERSON
Inspection Date: 2025-06-13
Completion Date: 2025-06-13
Notes: Locker room hard lids and office walls.
Inspection Status: Pass
Electrical Cover
Inspection Performed By: MICHAEL ANDERSON
Inspection Date: 2025-07-10
Completion Date: 2025-07-10
Notes: Relocated hallway wall in area 5.
Inspection Status: Pass
Plumbing Cover
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2025-07-10
Completion Date: 2025-07-10
Notes: laundry/office area.
Inspection Status: Pass
Building Framing Before Cover
Inspection Performed By: NICHOLAS SIM
Inspection Date: 2025-07-14
Completion Date: 2025-07-14
Notes: Hard lids and walls in office area ok. Hard lids in locker rooms need penetrations filled. Maintenance area hard lids ok.
Inspection Status: Fail
Building Framing Before Cover
Inspection Performed By: NICHOLAS SIM
Inspection Date: 2025-07-17
Completion Date: 2025-07-17
Notes: Corrections completed on locker room hard lids.
Inspection Status: Pass
Electrical Cover
Inspection Performed By: MICHAEL ANDERSON
Inspection Date: 2025-07-18
Completion Date: 2025-07-18
Notes: East side trench for water line and parking lot lights.
Inspection Status: Pass
Electrical Cover
Inspection Performed By: MICHAEL ANDERSON
Inspection Date: 2025-07-25
Completion Date: 2025-07-25
Notes: Underground for primary.
Inspection Status: Pass
Plumbing Ground Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2025-07-30
Completion Date: 2025-07-30
Notes: fire and wastewater buildings, will call back for trench drain.
Inspection Status: Pass
Electrical Cover
Inspection Performed By: MICHAEL ANDERSON
Inspection Date: 2025-08-01
Completion Date: 2025-08-01
Notes: Underground for waste water bldg. & fire pump house feeders.
Inspection Status: Pass
Plumbing Ground Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2025-08-05
Completion Date: 2025-08-05
Notes: wastewater trench drain and added hub drain.
Inspection Status: Pass
Gas Meter Release
Inspection Performed By: JONATHON KEENEY
Inspection Date: 2025-09-18
Completion Date: 2025-09-18
Notes: gas meter released for new gas trane. East outside wall.. see attached photo for #
Inspection Status: Pass
Electric Service Release
Inspection Performed By: MICHAEL ANDERSON
Inspection Date: 2025-10-07
Completion Date: 2025-10-07
Inspection Status: Pass
Plumbing Ground Inspection
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2025-10-31
Completion Date: 2025-10-31
Notes: test sink wastewater treatment
Inspection Status: Pass
Mechanical Cover
Inspection Performed By: JONATHON KEENEY
Inspection Date: 2025-11-19
Completion Date:
Notes: Met With Alex Politowicz, M E that designed the system. Walk thru with Ron Burchette with FD Hazmat. Some signage yet to be added to King valves, etc. Ammonia system fill Dec 5th. System startup to follow
Inspection Status: Fail
Mechanical Cover
Inspection Performed By: JONATHON KEENEY
Inspection Date: 2025-11-26
Completion Date:
Notes: MUA in both kitchens. Stainless steel on wall behind both hoods. Finish all flex heat runs. Wet switches on mini spits
Inspection Status: Fail
Plumbing Cover
Inspection Performed By: JASON KAUZLARICH
Inspection Date: 2025-11-26
Completion Date: 2025-11-26
Notes: Ceiling cover raw office and ready to eat office area.
Inspection Status: Pass
Electrical Cover
Inspection Performed By: MICHAEL ANDERSON
Inspection Date: 2025-12-03
Completion Date: 2025-12-03
Notes: Drop ceilings - area 1 & 5 , truckers lounge.
Inspection Status: Pass
Building Ceiling Inspection
Inspection Performed By: WILLIAM LITTLE
Inspection Date: 2025-12-08
Completion Date: 2025-12-08
Inspection Status: Pass
Mechanical Cover
Inspection Performed By: WILLIAM LITTLE
Inspection Date: 2025-12-08
Completion Date: 2025-12-08
Notes: Above-ceiling
Inspection Status: Pass
Electrical Final
Inspection Performed By: MICHAEL ANDERSON
Inspection Date: 2025-12-17
Completion Date: 2025-12-17
Notes: T. O.
Inspection Status: Pass
Building Final
Inspection Performed By: JACOB RALFS
Inspection Date: 2025-12-17
Completion Date: 2025-12-17
Notes: TEMP OCCUPANCY INSPECTION FOR PHASE ONE. FIRE ALARMS TO BE REINSPECTED
Inspection Status: Pass
Fire Marshall Final Inspection
Inspection Performed By:
Inspection Date: 2026-01-20
Completion Date: 2026-01-20
Notes: Per Fire Marshall - a few minor corrections, but ok for TCO.
Inspection Status: Fail
Electrical Final
Inspection Performed By: MICHAEL ANDERSON
Inspection Date: 2026-03-19
Completion Date: 2026-03-19
Inspection Status: Pass
Electrical Final
Inspection Performed By: MICHAEL ANDERSON
Inspection Date: 2026-03-19
Completion Date: 2026-03-19
Inspection Status: Pass
Building Footing
Inspection Performed By: MAX ADAMS
Inspection Date: 2022-11-28
Completion Date: 2022-11-28
Inspection Status: Pass
Building Footing
Inspection Performed By: MAX ADAMS
Inspection Date: 2022-11-29
Completion Date: 2022-11-29
Inspection Status: Pass
Building Footing
Inspection Performed By: MAX ADAMS
Inspection Date: 2022-12-02
Completion Date: 2022-12-02
Inspection Status: Pass
Building Footing
Inspection Performed By: MAX ADAMS
Inspection Date: 2022-12-16
Completion Date: 2022-12-16
Inspection Status: Pass
Building Footing
Inspection Performed By: MAX ADAMS
Inspection Date: 2023-01-04
Completion Date: 2023-01-04
Inspection Status: Pass
Building Footing
Inspection Performed By: MAX ADAMS
Inspection Date: 2023-01-10
Completion Date: 2023-01-10
Inspection Status: Pass
Building Footing
Inspection Performed By: JOHN CLAEYS
Inspection Date: 2024-02-12
Completion Date: 2024-02-12
Notes: NORTHEAST 1/3.
Inspection Status: Pass
Building Footing
Inspection Performed By: JOHN CLAEYS
Inspection Date: 2024-02-14
Completion Date: 2024-02-14
Notes: CENTER 1/3RD OF NORTH WALL.
Inspection Status: Pass
Building Footing
Inspection Performed By: JOHN CLAEYS
Inspection Date: 2024-02-16
Completion Date: 2024-02-16
Notes: 200 FT WEST OF PREVIOUS NORTH WALL APPROVAL.
Inspection Status: Pass
Building Pier Footings
Inspection Performed By: JOHN CLAEYS
Inspection Date: 2024-02-21
Completion Date: 2024-02-21
Notes: 2 - INTERIOR PIER PADS IN SOUTHEAST AREA OF BUILDING.
Inspection Status: Pass
Building Footing
Inspection Performed By: JOHN CLAEYS
Inspection Date: 2024-02-29
Completion Date: 2024-02-29
Notes: MORE NORTH EXTERIOR WALL FOOTINGS. ALSO INTERIOR FOOTINGS ON NORTHEAST AREA.
Inspection Status: Pass
Building Footing
Inspection Performed By: JOHN CLAEYS
Inspection Date: 2024-03-05
Completion Date: 2024-03-05
Notes: PART OF SOUTH WALL.
Inspection Status: Pass
Building Footing
Inspection Performed By: JOHN CLAEYS
Inspection Date: 2024-03-06
Completion Date: 2024-03-06
Notes: MORE NORTH WALL FOOTINGS / 3 PIERS.
Inspection Status: Pass
Building Footing
Inspection Performed By: JOHN CLAEYS
Inspection Date: 2024-03-07
Completion Date: 2024-03-07
Notes: NORTH WALL FOOTINGS. PIERS 7 AND 6 AND BULKHEADED APPROXIMATELY 8' PAST PIER 6 TOWARDS PIER 5.
Inspection Status: Pass
Building Footing
Inspection Performed By: JACOB RALFS
Inspection Date: 2024-03-15
Completion Date: 2024-03-15
Notes: NW CORNER BOTH WAYS
Inspection Status: Pass
Building Footing
Inspection Performed By: JOHN CLAEYS
Inspection Date: 2024-03-20
Completion Date: 2024-03-20
Notes: PART SOUTH WALL.
Inspection Status: Pass
Building Footing
Inspection Performed By: JOHN CLAEYS
Inspection Date: 2024-03-28
Completion Date: 2024-03-28
Notes: Southwest corner and part south wall.
Inspection Status: Pass
Building Footing
Inspection Performed By: JOHN CLAEYS
Inspection Date: 2024-04-09
Completion Date: 2024-04-09
Notes: BALANCE OF SOUTH EXTERIOR WALL FOOTINGS.
Inspection Status: Pass
Building Footing
Inspection Performed By: JOHN CLAEYS
Inspection Date: 2024-05-07
Completion Date:
Notes: STOOP FOOTING ON NORTHEAST CORNER OF THE BUILDING. OK AS VERBALLY DESCRIBED.
Inspection Status: Approved by Phone