Inspection Performed By:
Inspection Date: 2021-01-11
Completion Date: 2021-01-11
Notes: West Side partial:
• Contractor on site confirmed that the layer behind the face brick was solid tuck pointed per engineer’s report. I also left him a copy of this report for his use.
• Deteriorated bricks in the lower South-West portion has been removed & replaced.
• There were some masonry joints/ spalled bricks above this area that would be addresses once the temperatures rise. ( see photo)
• Install shoring on the North- West portion of the West façade where there are missing bricks, deformed lintel & sill of the window until this area is repaired per engineer’s report. (see Photo)
• Dumpster on the west area would be removed today.
Inspection Status: Pass