Inspection Performed By: 
														
							 
							Inspection Date: 2023-05-25
							
							Completion Date: 
							
							
														Notes: Rich & Trishna on site
-Interior CMU is being completed per engineer’s report with rebar & grout. One opening has been completed the other is being filled in with CMU.
•	Brick work will start today in sections. Mason’s will be doing the work.
•	Wall bracing will be installed per engineer’s design. 
•	Engineer will stop over periodically to ensure work is being done per his design.
•	City inspector will stop over periodically to see progress.
														Inspection Status: Incomplete